Technical Review and Advisory Panel (TRAP)
Bureau of Onsite Sewage Programs Workshop - October 17, 2011
- GENERAL SUBJECT MATTER TO BE CONSIDERED: permitting and approval standards of onsite sewage treatment systems that provide treatment
other than a septic tank, such as innovative systems, performance based treatment systems, and aerobic treatment units.
The next TRAP meeting is scheduled for:
|
Date: |
To be determined
|
|
Time:
|
|
|
Place:
|
|
|
|
|
|
Purpose: Identify and discuss issues relating to onsite sewage treatment and disposal systems which may require changes to Chapter 64E-6, Florida Administrative Code.
(All documents open in a new window. All documents are in the Portable
Document Format (pdf) and are less than 600 kb unless otherwise noted.)
TRAP Meeting Date |
Associated Documents
|
October 11, 2011 |
- Draft Meeting Minutes
- Agenda for the October 11, 2011 TRAP Meeting
|
December 2, 2010 |
- Draft Meeting Minutes
- Agenda for the December 2, 2010 TRAP Meeting
- Meeting Information Packet
(3.28 MB)
|
September 23, 2010 |
- Draft Meeting Minutes (906 KB)
- Agenda for the September 23, 2010 TRAP Meeting
- Meeting Information Packet
(4.17 MB)
-
Comments on Issue #10-11, Innovative System Reclassification
|
July 15, 2010 |
- Draft Meeting Minutes
- Agenda for the July 15, 2010 TRAP Meeting
- Meeting Information Packet (3.96 MB)
|
January 28, 2010 |
- Draft Meeting Minutes
- Agenda for the
January 28, 2010 TRAP Meeting
|
August 27, 2009
|
-
Draft Meeting Minutes
-
Agenda for the August 27, 2009 TRAP Meeting
-
Presentation: Estimating Residential Flows on Rooms Instead of Bedrooms
-
Presentation: Florida Onsite Sewage Nitrogen Removal Strategies (FOSNRS) Study (2.3 MB)
|
February 19, 2009
|
-
Draft Meeting Minutes
-
Agenda for the February 19, 2009 TRAP Meeting
- Issues under Discussion at the TRAP Meeting
-
Florida Senate 2009 SB 0118
-
Florida Senate 2009 SB 0274
- Progress Report on Nitrogen Reduction
for OSTDS
-
Report on Range of Costs to Implement an Mandatory Statewide 5-Year Septic Tank Inspection Program
-
Draft Notice of Proposed Rule
-
Wekiva Proposed Rule
-
Universal Bedroom Definition Report to the Florida Building Commission
-
Update on Bedroom/Room Definitions for Estimating Sewage Flow
-
Presentation on Use of Rooms as Sewage Flow Estimator
|
August 27, 2008 |
-
Draft Meeting Minutes
- Presentations:
- Alternative Method
to Remove Nitrate and Phosphorus from Waste Water
- Drainfield Issue
- Research Program Update (1.3 MB)
- Issue 08-12: Drainfield Loading Rates
|
July 30, 2008 |
- Wekiva Study Area Presentation from August 21, 2007 Meeting
- Alternative Drainfield Product Sizing
Comparison
- Alternative Drainfield
Product Sizing Diagrams
- Alternative Nitrate and
Phosphorous Removal Technology
Soil Loading Rate Failure
Comparison
-
Draft Meeting Minutes for the
June 6, 2008 TRAP Meeting
|
Hardcopies of the above documents may be obtained by contacting:
the Bureau of Onsite Sewage Programs, Department of Health, 4052 Bald
Cypress Way, Bin # A-08, Tallahassee, Florida 32399-1713. Any person
requiring a special accommodation at this meeting because of disability or
physical impairment should contact Shirley Kugler at 850-245-4070 at least two
weeks prior to the meeting.
*Note: All materials are in the Portable Document Format (PDF). You may need
to download the free
Adobe Acrobat Reader to view the files.
This page was last updated November 22, 2011.